While using VBScript LoadPicture() function, Error calculating dimensions for: E:\www\3592\www\onlinedb\cjgmfm\pics\Webp.net-gifmaker (1).gifPath/File access error

 
While using VBScript LoadPicture() function, Error calculating dimensions for: E:\www\3592\www\onlinedb\cjgmfm\pics\cooperators_chad_180x270_rev1.gifPath/File access error


While using VBScript LoadPicture() function, Error calculating dimensions for: E:\www\3592\www\onlinedb\cjgmfm\pics\CarvethCare.gifPath/File access error


While using VBScript LoadPicture() function, Error calculating dimensions for: E:\www\3592\www\onlinedb\cjgmfm\pics\ganboatline-180x180-r042016-1.gifPath/File access error


MORE CAUSEWAY CLOSURES PLANNED
5/18/2017 6:56:08 AM


More closures, both short and long term, are expected for the LaSalle Causeway over the next two years. The ongoing maintenance and construction work is expected to have a significant impact on commuter times, emergency response times, transit service, and active transportation. You can expect more closures ranging from 48 hours to 15 days into this year and next. A city review of the causeway's past and future closures noted: "The need for longer closures is becoming necessary in order to undertake required structural repairs to keep the bridge safe and operational." They city's engineering department says the bridge will be closed for at least five more repair and maintenance projects through 2017 and 2018. The tentative list includes; a three day closure in early winter for North Guide assembly repair, a five to10 day closure in late winter for motor control work, a three day closure in summer 2018 for grating repairs, a 10-15 day closure for grating replacement early winter 2018, and a three day closure for structural repairs late summer 2018.
       

WebReadyTM Powered by WireReady® NSI  |  © Copyright 2008-2011 My Broadcasting Corporation

Back to News








 

Copyright 2017 GananoqueNow.ca. All rights reserved.

This site powered by PromoSuite Interactive